HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Perth we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.
- Area
- Perth and Kinross, Scotland
- Postcodes
- PH1 and PH2
- Location
- 18 miles west of Dundee
- Pricing region
- Scotland
What do rewires and EICR remedials in Perth involve?
- Electrical installation certificates
- Extra sockets and USB points in rooms
- Bathroom and kitchen circuits
- Emergency lighting circuits
- Mains-powered alarm circuits
Which rules apply in Perth?
Rewires and EICR remedials in Perth must satisfy national law for Scotland, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:
- An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
- Landlords must also be on the Scottish landlord register, renewed every 3 years.
How much do rewires and EICR remedials cost in Perth?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £140 – £380 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £660 – £1,350 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,700 – £11,400 | house |
These are typical ranges including VAT, adjusted for Scotland, where costs run below the UK average. The fixed price for a house in Perth follows a site visit.
How long does it take?
Most jobs of this kind take 1–7 working days. If a council deadline applies in Perth, tell us at the first call so the programme is built around it.
When do Perth landlords need it?
Typical reasons for this work in Perth:
- An EICR with C1, C2 or FI items
- Converting or adding rooms
Questions about rewires and EICR remedials in Perth
Is a full rewire disruptive?
Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.
How far do you travel from Perth?
We cover the whole of Perth and Kinross and work UK-wide. For Perth the nearest towns on our list are Glenrothes (17 miles), Dundee (18 miles), Cowdenbeath (20 miles).
Does a shared house in Perth need an HMO licence?
Yes, if 3 or more people who are not from one or two families share amenities as their main home: every HMO in Scotland needs a licence from the council, lasting up to 3 years.
How much do rewires and EICR remedials cost in Perth?
Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Perth
- Glenrothes · 17 mi
- Dundee · 18 mi
- Cowdenbeath · 20 mi
- Kirkcaldy · 22 mi
- Dunfermline · 22 mi
- Alloa · 24 mi
- All of Perth and Kinross
Other HMO services in Perth
- Fire alarm and detection systems in Perth
- Licence condition and schedule-of-works in Perth
- Full HMO refurbishment in Perth
- House to HMO conversion in Perth
- Bedroom upgrades and room refits in Perth
- Escape routes, emergency lighting and fire stopping in Perth
- EPC and energy upgrades in Perth
- Ensuite installation in Perth
