HMORefurbishment

Perth and Kinross, Scotland

EPC and energy upgrades in Perth

EPC and energy upgrades in Perth and the PH1 and PH2 postcode areas, for landlords and investors with shared houses across Perth and Kinross. Free site visit, then a fixed written quote.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. Perth is 18 miles west of Dundee. We price EPC and energy upgrades there against Scotland’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Perth and Kinross, Scotland
Postcodes
PH1 and PH2
Location
18 miles west of Dundee
Pricing region
Scotland

What do EPC and energy upgrades in Perth involve?

  • Heating, hot water and smart controls
  • Double or secondary glazing
  • Review of the EPC recommendations
  • Ventilation to control condensation
  • A post-works EPC through your assessor

Which rules apply in Perth?

The rules below are the Scotland-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Perth before we price.

  • Check current Scottish Government guidance on energy efficiency standards for private rented homes before planning upgrades.
  • Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.
  • A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.

How much do EPC and energy upgrades cost in Perth?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£620 – £1,200house
Internal wall insulation£60 – £100£60 – £100m² of wall

Prices in Perth are shown with our regional adjustment for Scotland (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Perth landlords need it?

Typical reasons for this work in Perth:

  • Planning ahead for higher standards
  • High bills in an all-inclusive rent

Questions about EPC and energy upgrades in Perth

Will insulation cause condensation?

Not if it is designed with ventilation and vapour control. We always pair insulation with suitable ventilation.

How far do you travel from Perth?

We cover the whole of Perth and Kinross and work UK-wide. For Perth the nearest towns on our list are Glenrothes (17 miles), Dundee (18 miles), Cowdenbeath (20 miles).

Where do I check the HMO rules for an address in Perth?

With the local council for the address. Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.

How much do EPC and energy upgrades cost in Perth?

Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Perth

Other HMO services in Perth

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote