HMORefurbishment

Somerset, England

Rewires and EICR remedials in Mendip

Rewires and EICR remedials in Mendip and the BA5 postcode areas, for landlords and investors with shared houses across Somerset. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Mendip is 15 miles south of Bristol. We price rewires and EICR remedials there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Somerset, England
Postcodes
BA5
Location
15 miles south of Bristol
Pricing region
South West

What do rewires and EICR remedials in Mendip involve?

  • EICR remedial works with confirmation
  • Emergency lighting circuits
  • Extra sockets and USB points in rooms
  • Electrical installation certificates
  • Consumer unit replacement

Which rules apply in Mendip?

Here is what usually applies to a Mendip job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Mendip?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£160 – £420inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£730 – £1,450house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,250 – £12,500house

These are typical ranges including VAT, adjusted for South West, where costs run above the UK average. The fixed price for a house in Mendip follows a site visit.

How long does it take?

Most jobs of this kind take 1–7 working days. If a council deadline applies in Mendip, tell us at the first call so the programme is built around it.

When do Mendip landlords need it?

Landlords in Mendip most often ask us for this when:

  • Converting or adding rooms
  • An EICR with C1, C2 or FI items

Questions about rewires and EICR remedials in Mendip

Do you issue certificates?

Yes: installation or minor works certificates and written confirmation of remedials, issued by the qualified electrician who did the work.

Do you cover all of Mendip?

Yes. We work across Mendip and the BA5 postcode areas, plus the rest of Somerset. Nearby places we also cover include Frome, Nailsea, Bath.

Where do I check the HMO rules for an address in Mendip?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do rewires and EICR remedials cost in Mendip?

Our guide ranges for South West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Mendip

Other HMO services in Mendip

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote