HMORefurbishment

Surrey, England

Rewires and EICR remedials in Staines

Rewires and EICR remedials in Staines and the TW18 and TW19 postcode areas, for landlords and investors with shared houses across Surrey. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. In Staines, a town of around 50,000 people in Surrey, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Surrey, England
Postcodes
TW18 and TW19
Location
17 miles west of London
Pricing region
South East

What do rewires and EICR remedials in Staines involve?

  • Bathroom and kitchen circuits
  • Consumer unit replacement
  • Mains-powered alarm circuits
  • Electrical installation certificates
  • Extra sockets and USB points in rooms

Which rules apply in Staines?

Rewires and EICR remedials in Staines must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.

How much do rewires and EICR remedials cost in Staines?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£170 – £450inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£780 – £1,550house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,700 – £13,450house

These are typical ranges including VAT, adjusted for South East, where costs run above the UK average. The fixed price for a house in Staines follows a site visit.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Staines landlords need it?

Typical reasons for this work in Staines:

  • An EICR with C1, C2 or FI items
  • Converting or adding rooms

Questions about rewires and EICR remedials in Staines

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

Which postcodes in Staines do you work in?

All of them, including TW18 and TW19, and the surrounding parts of Surrey.

Does a shared house in Staines need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Staines?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Staines

Other HMO services in Staines

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.