- Nation
- England
- Pricing region
- South East
- Postcode areas
- GU, RH, KT, TW
- Main towns
- Woking, Guildford, Esher, Redhill, Staines
What do rewires and EICR remedials in Surrey involve?
- Electrical installation certificates
- Extra sockets and USB points in rooms
- Emergency lighting circuits
- Bathroom and kitchen circuits
- Full or partial rewires
- Mains-powered alarm circuits
Which rules apply in Surrey?
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much do rewires and EICR remedials cost in Surrey?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £170 – £450 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £780 – £1,550 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,700 – £13,450 | house |
Typical time on site: 1–7 working days. For a figure for your house, try the guide-price tool.
Rewires and EICR remedials by town in Surrey
- Woking
- Guildford
- Esher
- Redhill
- Staines
- Banstead
- Leatherhead
- Aldershot
- Ewell
- Farnham
- Epsom
- Camberley
- Egham
- Sunbury-on-Thames
- Ashford (Surrey)
- Walton-on-Thames
- Godalming
- Reigate
- Horley
- Caterham
Questions about rewires and EICR remedials in Surrey
Is a full rewire disruptive?
Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.
How long do I have to fix EICR items?
In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.
Do you carry out rewires and EICR remedials across Surrey?
Yes, across the whole of Surrey, including Woking, Guildford, Esher.
Who licenses HMOs in Surrey?
HMOs in Surrey are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.
Other HMO services in Surrey
- Fire alarm and detection systems in Surrey
- Licence condition and schedule-of-works in Surrey
- Full HMO refurbishment in Surrey
- House to HMO conversion in Surrey
- Bedroom upgrades and room refits in Surrey
- Escape routes, emergency lighting and fire stopping in Surrey
- Void and between-tenancy refurbs in Surrey
- Small HMO conversions (3–6 sharers) in Surrey
