- Nation
- England
- Pricing region
- South East
- Postcode areas
- GU, RH, KT, TW
- Main towns
- Woking, Guildford, Esher, Redhill, Staines
What does house to HMO conversion in Surrey involve?
- New stud walls, door openings and room splits
- Fire doors, fire-rated linings and an interlinked fire alarm
- A communal kitchen sized for the number of sharers
- Decoration, flooring and a handover pack for licensing
- Rewiring or upgrades, with an electrical certificate
- Measured survey and room-size check against the licensing standards
Which rules apply in Surrey?
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Licensed HMOs must meet national minimum bedroom sizes: 6.51 m² for one person aged 10 or over, 10.22 m² for two, and 4.64 m² for a child under 10.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- 7 or more sharers is a sui generis large HMO and normally needs planning permission.
- A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much does house to HMO conversion cost in Surrey?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Typical 3–4 bed house to a 5–6 bed HMO, all-in | £30,000 – £75,000 | £33,600 – £84,000 | project |
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,900 – £7,300 | letting room |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £4,500 – £11,200 | ensuite |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £8,950 – £20,150 | kitchen |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £900 – £2,250 | house |
Typical time on site: 6–14 weeks. For a figure for your house, try the guide-price tool.
House to HMO conversion by town in Surrey
- Woking
- Guildford
- Esher
- Redhill
- Staines
- Banstead
- Leatherhead
- Aldershot
- Ewell
- Farnham
- Epsom
- Camberley
- Egham
- Sunbury-on-Thames
- Ashford (Surrey)
- Walton-on-Thames
- Godalming
- Reigate
- Horley
- Caterham
Questions about house to HMO conversion in Surrey
How long does a house to HMO conversion take?
Most conversions of a three or four-bedroom house take six to fourteen weeks on site, after drawings and any approvals. Bigger layout changes, extensions or loft rooms add time.
Will the house pass licensing once the works are done?
We build to the standards your council publishes and give you the certificates and drawings an inspection asks for. The licence decision belongs to the licensing authority, so we never promise approval, but we design to meet the written standards from day one.
Do you carry out house to HMO conversion across Surrey?
Yes, across the whole of Surrey, including Woking, Guildford, Esher.
Who licenses HMOs in Surrey?
HMOs in Surrey are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.
Other HMO services in Surrey
- Small HMO conversions (3–6 sharers) in Surrey
- Large HMO conversions (7+ sharers) in Surrey
- HMO fire safety upgrades in Surrey
- Ensuite installation in Surrey
- Communal kitchen refits in Surrey
- Layout changes and room reconfiguration in Surrey
- Licence condition and schedule-of-works in Surrey
- Rewires and EICR remedials in Surrey
