HMORefurbishment

Tyne and Wear, England

Rewires and EICR remedials in Felling

Rewires and EICR remedials in Felling and the NE8, NE10 and NE82 postcode areas, for landlords and investors with shared houses across Tyne and Wear. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Felling (NE8, NE10 and NE82) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Tyne and Wear, England
Postcodes
NE8, NE10 and NE82
Location
2 miles south-east of Newcastle upon Tyne
Pricing region
North East

What do rewires and EICR remedials in Felling involve?

  • Extra sockets and USB points in rooms
  • Bathroom and kitchen circuits
  • Emergency lighting circuits
  • Electrical installation certificates
  • Full or partial rewires

Which rules apply in Felling?

Rewires and EICR remedials in Felling must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.

How much do rewires and EICR remedials cost in Felling?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £370inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£640 – £1,300house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,500 – £11,050house

Prices in Felling are shown with our regional adjustment for North East (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Felling landlords need it?

Typical reasons for this work in Felling:

  • An EICR with C1, C2 or FI items
  • Converting or adding rooms

Questions about rewires and EICR remedials in Felling

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

Do you cover all of Felling?

Yes. We work across Felling and the NE8, NE10 and NE82 postcode areas, plus the rest of Tyne and Wear. Nearby places we also cover include Gateshead, Newcastle upon Tyne, Hebburn.

Does a shared house in Felling need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Felling?

Our guide ranges for North East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Felling

Other HMO services in Felling

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote