A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. For a house in Felling we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.
- Area
- Tyne and Wear, England
- Postcodes
- NE8, NE10 and NE82
- Location
- 2 miles south-east of Newcastle upon Tyne
- Pricing region
- North East
What does full HMO refurbishment in Felling involve?
- Decoration, flooring and furniture-ready rooms
- Condition survey and schedule of works
- Damp and mould repairs
- Heating and hot water upgrades
- New or refitted kitchens and bathrooms
Which rules apply in Felling?
The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Felling before we price.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
How much does full HMO refurbishment cost in Felling?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £3,700 – £8,300 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,350 – £16,550 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £5,050 – £8,300 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £740 – £1,850 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,500 – £11,050 | house |
These are typical ranges including VAT, adjusted for North East, where costs run below the UK average. The fixed price for a house in Felling follows a site visit.
How long does it take?
Most jobs of this kind take 4–12 weeks. If a council deadline applies in Felling, tell us at the first call so the programme is built around it.
When do Felling landlords need it?
Landlords in Felling most often ask us for this when:
- A house that has been let hard for years
- You have bought an existing HMO that needs work
Questions about full HMO refurbishment in Felling
Will you deal with the council’s list of works?
Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.
Which postcodes in Felling do you work in?
All of them, including NE8, NE10 and NE82, and the surrounding parts of Tyne and Wear.
Where do I check the HMO rules for an address in Felling?
With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much does full HMO refurbishment cost in Felling?
Our guide ranges for North East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Full HMO refurbishment near Felling
- Gateshead · 1 mi
- Newcastle upon Tyne · 2 mi
- Hebburn · 3 mi
- Wallsend · 3 mi
- Gosforth · 4 mi
- Jarrow · 4 mi
- All of Tyne and Wear
Other HMO services in Felling
- Void and between-tenancy refurbs in Felling
- HMO fire safety upgrades in Felling
- Rewires and EICR remedials in Felling
- Communal kitchen refits in Felling
- Shared bathroom and shower room refits in Felling
- Damp, mould and HHSRS repairs in Felling
- Small HMO conversions (3–6 sharers) in Felling
- Ensuite installation in Felling
