HMORefurbishment

Glasgow City, Scotland

EPC and energy upgrades in Glasgow

Planning EPC and energy upgrades in Glasgow? We survey, price and build HMO works across Glasgow (G1, G2, G3 and G22) and the rest of Glasgow City.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. For a house in Glasgow we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately. Glasgow has a university population, so many shared houses are let to students on yearly tenancies, and summer is the main window for works.

Area
Glasgow City, Scotland
Postcodes
G1, G2, G3 and G22
Council
Glasgow City Council
Pricing region
Scotland

What do EPC and energy upgrades in Glasgow involve?

  • Double or secondary glazing
  • Loft and roof insulation
  • A post-works EPC through your assessor
  • Review of the EPC recommendations
  • Internal or external wall insulation

Which rules apply in Glasgow?

The rules below are the Scotland-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Glasgow before we price.

  • Check current Scottish Government guidance on energy efficiency standards for private rented homes before planning upgrades.
  • Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.
  • A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.

How much do EPC and energy upgrades cost in Glasgow?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£620 – £1,200house
Internal wall insulation£60 – £100£60 – £100m² of wall

Prices in Glasgow are shown with our regional adjustment for Scotland (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.

For student houses in Glasgow, booking by spring is the safest way to make the summer gap.

When do Glasgow landlords need it?

We usually get the call when:

  • Planning ahead for higher standards
  • An EPC below the required minimum

Questions about EPC and energy upgrades in Glasgow

Are there grants?

Some schemes support landlords. Eligibility changes, so check the current government and energy company schemes for your nation.

Do you cover all of Glasgow?

Yes. We work across Glasgow and the G1, G2, G3 and G22 postcode areas, plus the rest of Glasgow City. Nearby places we also cover include Rutherglen, Bishopbriggs, Giffnock.

Which council covers HMOs in Glasgow?

Glasgow is covered by Glasgow City Council. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.

How much do EPC and energy upgrades cost in Glasgow?

Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Glasgow

Other HMO services in Glasgow

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote