HMORefurbishment

Highland, Scotland

EPC and energy upgrades in Inverness

Planning EPC and energy upgrades in Inverness? We survey, price and build HMO works across Inverness (IV1 and IV2) and the rest of Highland.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. In Inverness, a town of around 50,000 people in Highland, the work is planned around the HMO rules for Scotland and the council’s written HMO standards. With students as well as working sharers renting in Inverness, we plan bigger jobs for the gap between academic-year tenancies where we can.

Area
Highland, Scotland
Postcodes
IV1 and IV2
Pricing region
Scotland

What do EPC and energy upgrades in Inverness involve?

  • Double or secondary glazing
  • Heating, hot water and smart controls
  • A post-works EPC through your assessor
  • Loft and roof insulation
  • LED lighting

Which rules apply in Inverness?

EPC and energy upgrades in Inverness must satisfy national law for Scotland, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Check current Scottish Government guidance on energy efficiency standards for private rented homes before planning upgrades.
  • Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.
  • A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.

How much do EPC and energy upgrades cost in Inverness?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£620 – £1,200house
Internal wall insulation£60 – £100£60 – £100m² of wall

Prices in Inverness are shown with our regional adjustment for Scotland (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.

For student houses in Inverness, booking by spring is the safest way to make the summer gap.

When do Inverness landlords need it?

Landlords in Inverness most often ask us for this when:

  • An EPC below the required minimum
  • Planning ahead for higher standards

Questions about EPC and energy upgrades in Inverness

Which upgrade gives the best EPC improvement?

It depends on the house. Loft insulation and heating controls are often the cheapest gains; wall insulation and heating systems make larger differences.

How far do you travel from Inverness?

We cover the whole of Highland and work UK-wide. For Inverness the nearest towns on our list are Elgin (36 miles), Fort William (57 miles), Inverurie (70 miles).

Does a shared house in Inverness need an HMO licence?

Yes, if 3 or more people who are not from one or two families share amenities as their main home: every HMO in Scotland needs a licence from the council, lasting up to 3 years.

How much do EPC and energy upgrades cost in Inverness?

Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Inverness

Other HMO services in Inverness

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote