HMORefurbishment

Scottish Borders, Scotland

EPC and energy upgrades in Hawick

We carry out EPC and energy upgrades in Hawick, 40 miles south-east of Edinburgh, working to the HMO rules that apply in Scotland and to the council’s written HMO standards.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. For a house in Hawick we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Scottish Borders, Scotland
Postcodes
TD9
Location
40 miles south-east of Edinburgh
Pricing region
Scotland

What do EPC and energy upgrades in Hawick involve?

  • Heating, hot water and smart controls
  • Loft and roof insulation
  • Review of the EPC recommendations
  • LED lighting
  • Ventilation to control condensation

Which rules apply in Hawick?

The rules below are the Scotland-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Hawick before we price.

  • Check current Scottish Government guidance on energy efficiency standards for private rented homes before planning upgrades.
  • Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.
  • A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.

How much do EPC and energy upgrades cost in Hawick?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£620 – £1,200house
Internal wall insulation£60 – £100£60 – £100m² of wall

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Hawick can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Most jobs of this kind take 2–15 working days. If a council deadline applies in Hawick, tell us at the first call so the programme is built around it.

When do Hawick landlords need it?

We usually get the call when:

  • Planning ahead for higher standards
  • An EPC below the required minimum

Questions about EPC and energy upgrades in Hawick

Will insulation cause condensation?

Not if it is designed with ventilation and vapour control. We always pair insulation with suitable ventilation.

How far do you travel from Hawick?

We cover the whole of Scottish Borders and work UK-wide. For Hawick the nearest towns on our list are Mayfield (33 miles), Penicuik (33 miles), Bonnyrigg (34 miles).

Where do I check the HMO rules for an address in Hawick?

With the local council for the address. Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.

How much do EPC and energy upgrades cost in Hawick?

Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Hawick

Other HMO services in Hawick

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote