HMORefurbishment

Surrey, England

EPC and energy upgrades in Horley

We carry out EPC and energy upgrades in Horley, 23 miles south of London, working to the HMO rules that apply in England and to the council’s written HMO standards.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. Horley is 23 miles south of London. We price EPC and energy upgrades there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Surrey, England
Postcodes
RH6
Location
23 miles south of London
Pricing region
South East

What do EPC and energy upgrades in Horley involve?

  • Internal or external wall insulation
  • Heating, hot water and smart controls
  • Ventilation to control condensation
  • Double or secondary glazing
  • Review of the EPC recommendations

Which rules apply in Horley?

The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Horley before we price.

  • Rented homes must currently meet at least EPC E, with a £3,500 spending cap. The government plans EPC C by October 2030, subject to legislation.
  • Councils assess hazards, including damp, mould and fire, under the HHSRS; revised regulations and guidance applied from 23 June 2026.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

How much do EPC and energy upgrades cost in Horley?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£730 – £1,400house
Internal wall insulation£60 – £100£70 – £110m² of wall

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Horley can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 2–15 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Horley landlords need it?

We usually get the call when:

  • Planning ahead for higher standards
  • An EPC below the required minimum

Questions about EPC and energy upgrades in Horley

Are there grants?

Some schemes support landlords. Eligibility changes, so check the current government and energy company schemes for your nation.

Which postcodes in Horley do you work in?

All of them, including RH6, and the surrounding parts of Surrey.

Does a shared house in Horley need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do EPC and energy upgrades cost in Horley?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Horley

Other HMO services in Horley

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote