HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. In Crawley, a place of roughly 120,000 people in West Sussex, the work is planned around the HMO rules for England and the council’s written HMO standards.
- Area
- West Sussex, England
- Postcodes
- RH10, RH11 and RH77
- Location
- 20 miles north of Brighton
- Pricing region
- South East
What do EPC and energy upgrades in Crawley involve?
- A post-works EPC through your assessor
- LED lighting
- Loft and roof insulation
- Heating, hot water and smart controls
- Internal or external wall insulation
Which rules apply in Crawley?
The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Crawley before we price.
- Rented homes must currently meet at least EPC E, with a £3,500 spending cap. The government plans EPC C by October 2030, subject to legislation.
- Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.
- A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
How much do EPC and energy upgrades cost in Crawley?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Loft insulation, whole house | £650 – £1,250 | £730 – £1,400 | house |
| Internal wall insulation | £60 – £100 | £70 – £110 | m² of wall |
Prices in Crawley are shown with our regional adjustment for South East (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.
How long does it take?
Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.
When do Crawley landlords need it?
Landlords in Crawley most often ask us for this when:
- High bills in an all-inclusive rent
- An EPC below the required minimum
Questions about EPC and energy upgrades in Crawley
What EPC does a rented HMO need?
In England and Wales most lets must currently reach at least EPC E, and the government plans EPC C in England by 2030, subject to legislation. How an HMO is let can affect how the EPC rules apply, so check the current guidance for your property.
Do you cover all of Crawley?
Yes. We work across Crawley and the RH10, RH11 and RH77 postcode areas, plus the rest of West Sussex. Nearby places we also cover include Horley, Horsham, East Grinstead.
Where do I check the HMO rules for an address in Crawley?
With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much do EPC and energy upgrades cost in Crawley?
Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
EPC and energy upgrades near Crawley
- Horley · 4 mi
- Horsham · 7 mi
- East Grinstead · 8 mi
- Reigate · 9 mi
- Haywards Heath · 9 mi
- Redhill · 9 mi
- All of West Sussex
Other HMO services in Crawley
- Damp, mould and HHSRS repairs in Crawley
- Full HMO refurbishment in Crawley
- Commercial and above-shop to HMO in Crawley
- Rewires and EICR remedials in Crawley
- Professional and co-living HMO refurbs in Crawley
- Loft conversions for extra rooms in Crawley
- House to HMO conversion in Crawley
- Void and between-tenancy refurbs in Crawley
