HMORefurbishment

Dorset, England

Extensions for extra rooms in Weymouth

Extensions for extra rooms in Weymouth and the DT3 and DT4 postcode areas, for landlords and investors with shared houses across Dorset. Free site visit, then a fixed written quote.

Three-storey house under full scaffolding with guardrails and brick guards during refurbishment works

An HMO extension adds space to a shared house, usually a ground-floor bedroom with ensuite or a bigger communal kitchen. For a house in Weymouth we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Dorset, England
Postcodes
DT3 and DT4
Location
47 miles east of Exeter
Pricing region
South West

What do extensions for extra rooms in Weymouth involve?

  • Kitchen or bedroom fit-out
  • Heating, insulation and glazing
  • Ensuite drainage and extraction
  • Foundations, structure and roof
  • Planning route check and drawings

Which rules apply in Weymouth?

Here is what usually applies to a Weymouth job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • 7 or more sharers is a sui generis large HMO and normally needs planning permission.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.

How much do extensions for extra rooms cost in Weymouth?

ItemUK typicalLocal guidePer
Single-storey extension, about 15 m²£35,000 – £60,000£36,400 – £62,400project
Single-storey extension per m²£1,800 – £4,000£1,850 – £4,150m²

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Weymouth can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Most jobs of this kind take 8–14 weeks. If a council deadline applies in Weymouth, tell us at the first call so the programme is built around it.

When do Weymouth landlords need it?

Landlords in Weymouth most often ask us for this when:

  • Moving to more sharers with consent
  • A kitchen too small for the number of sharers

Questions about extensions for extra rooms in Weymouth

Is a kitchen extension worth it?

Often, when the existing kitchen limits how many people the council will allow. A bigger kitchen can unlock an extra room.

Which postcodes in Weymouth do you work in?

All of them, including DT3 and DT4, and the surrounding parts of Dorset.

Does a shared house in Weymouth need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do extensions for extra rooms cost in Weymouth?

Our guide ranges for South West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Extensions for extra rooms near Weymouth

Other HMO services in Weymouth

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote