HMORefurbishment

Greater London, England

Extensions for extra rooms in Chelsea

We carry out extensions for extra rooms in Chelsea, 2 miles south-west of London, working to the HMO rules that apply in England and to the council’s written HMO standards.

Three-storey house under full scaffolding with guardrails and brick guards during refurbishment works

An HMO extension adds space to a shared house, usually a ground-floor bedroom with ensuite or a bigger communal kitchen. In Chelsea, a town of around 60,000 people in Greater London, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Greater London, England
Postcodes
SW3 and SW10
Location
2 miles south-west of London
Pricing region
London

What do extensions for extra rooms in Chelsea involve?

  • Building control completion
  • Kitchen or bedroom fit-out
  • Fire separation and detection extended to the new space
  • Planning route check and drawings
  • Foundations, structure and roof

Which rules apply in Chelsea?

Here is what usually applies to a Chelsea job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • 7 or more sharers is a sui generis large HMO and normally needs planning permission.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.

How much do extensions for extra rooms cost in Chelsea?

ItemUK typicalLocal guidePer
Single-storey extension, about 15 m²£35,000 – £60,000£44,800 – £76,800project
Single-storey extension per m²£1,800 – £4,000£2,300 – £5,100m²

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Chelsea can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 8–14 weeks on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Chelsea landlords need it?

Typical reasons for this work in Chelsea:

  • Moving to more sharers with consent
  • A kitchen too small for the number of sharers

Questions about extensions for extra rooms in Chelsea

Will the extension affect neighbours?

Possibly, if it is on or near a boundary. Party wall procedures may apply in England and Wales.

Which postcodes in Chelsea do you work in?

All of them, including SW3 and SW10, and the surrounding parts of Greater London.

Where do I check the HMO rules for an address in Chelsea?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do extensions for extra rooms cost in Chelsea?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Extensions for extra rooms near Chelsea

Other HMO services in Chelsea

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote