HMO fire safety upgrades bring a shared house up to the fire standard its size and layout need. In Widnes, a town of around 60,000 people in Cheshire, the work is planned around the HMO rules for England and the council’s written HMO standards.
- Area
- Cheshire, England
- Postcodes
- WA7, WA8 and WA88
- Location
- 11 miles east of Liverpool
- Pricing region
- North West
What do HMO fire safety upgrades in Widnes involve?
- Fire doors with closers and seals
- Works priced against your fire risk assessment
- Fire stopping of service holes
- Emergency lighting where needed
- Interlinked smoke and heat detection
Which rules apply in Widnes?
Here is what usually applies to a Widnes job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
- Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
How much do HMO fire safety upgrades cost in Widnes?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £770 – £1,900 | house |
| Panel alarm system (Grade A type), larger HMO | £1,750 – £4,500 | £1,700 – £4,300 | house |
| FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted | £300 – £600 | £290 – £580 | door |
| New FD30S fire doorset with frame, fitted | £600 – £1,300 | £580 – £1,250 | door |
| Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate) | £2,000 – £6,000 | £1,900 – £5,750 | house |
Prices in Widnes are shown with our regional adjustment for North West (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.
How long does it take?
Most jobs of this kind take 3–10 working days. If a council deadline applies in Widnes, tell us at the first call so the programme is built around it.
When do Widnes landlords need it?
We usually get the call when:
- A fire risk assessment has listed actions
- Converting a house to an HMO
Questions about HMO fire safety upgrades in Widnes
Can you upgrade existing doors?
Sometimes, if the door and frame are sound. Often a certified fire door set is the cheaper and more reliable option.
Which postcodes in Widnes do you work in?
All of them, including WA7, WA8 and WA88, and the surrounding parts of Cheshire.
Does a shared house in Widnes need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much do HMO fire safety upgrades cost in Widnes?
Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
HMO fire safety upgrades near Widnes
- Runcorn · 1 mi
- Halewood · 4 mi
- Great Sankey · 4 mi
- Speke · 5 mi
- Prescot · 5 mi
- Huyton · 6 mi
- All of Cheshire
Other HMO services in Widnes
- Fire alarm and detection systems in Widnes
- Fire doors in Widnes
- Escape routes, emergency lighting and fire stopping in Widnes
- Licence condition and schedule-of-works in Widnes
- Rewires and EICR remedials in Widnes
- Large HMO conversions (7+ sharers) in Widnes
- Professional and co-living HMO refurbs in Widnes
- Sound insulation in Widnes
