HMORefurbishment

Surrey, England

HMO fire safety upgrades in Woking

HMO fire safety upgrades in Woking and the GU21 and GU22 postcode areas, for landlords and investors with shared houses across Surrey. Free site visit, then a fixed written quote.

Refurbished staircase and landing with fire doors and emergency lighting forming a protected route

HMO fire safety upgrades bring a shared house up to the fire standard its size and layout need. Woking is 20 miles south-east of Reading. We price HMO fire safety upgrades there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Surrey, England
Postcodes
GU21 and GU22
Location
20 miles south-east of Reading
Pricing region
South East

What do HMO fire safety upgrades in Woking involve?

  • Interlinked smoke and heat detection
  • Commissioning certificates and a handover pack
  • Fire stopping of service holes
  • Emergency lighting where needed
  • Fire-resisting linings to the escape route

Which rules apply in Woking?

HMO fire safety upgrades in Woking must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.

How much do HMO fire safety upgrades cost in Woking?

ItemUK typicalLocal guidePer
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
Panel alarm system (Grade A type), larger HMO£1,750 – £4,500£1,950 – £5,050house
FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted£300 – £600£340 – £670door
New FD30S fire doorset with frame, fitted£600 – £1,300£670 – £1,450door
Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate)£2,000 – £6,000£2,250 – £6,700house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Woking can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Most jobs of this kind take 3–10 working days. If a council deadline applies in Woking, tell us at the first call so the programme is built around it.

When do Woking landlords need it?

Typical reasons for this work in Woking:

  • Converting a house to an HMO
  • A fire risk assessment has listed actions

Questions about HMO fire safety upgrades in Woking

Who writes the fire risk assessment?

You arrange it, through a competent assessor. We price and carry out the works it recommends and give you the evidence.

Do you cover all of Woking?

Yes. We work across Woking and the GU21 and GU22 postcode areas, plus the rest of Surrey. Nearby places we also cover include Guildford, Egham, Walton-on-Thames.

Where do I check the HMO rules for an address in Woking?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do HMO fire safety upgrades cost in Woking?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

HMO fire safety upgrades near Woking

Other HMO services in Woking

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote