Licence condition works are the jobs a council asks for before or after granting an HMO licence: things like extra detection, fire doors, a second bathroom, kitchen changes or repairs. For a house in Ely we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.
- Area
- Cambridgeshire, England
- Postcodes
- CB6 and CB7
- Location
- 15 miles north-east of Cambridge
- Pricing region
- East of England
What does licence condition and schedule-of-works in Ely involve?
- A completion letter for your licence file
- Programme set to meet the council deadline
- Liaison with you before the council revisits
- Follow-up works after re-inspection
- Certificates and photos for each item
Which rules apply in Ely?
Licence condition and schedule-of-works in Ely must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- Councils assess hazards, including damp, mould and fire, under the HHSRS; revised regulations and guidance applied from 23 June 2026.
How much does licence condition and schedule-of-works cost in Ely?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Typical allowance for minor amenity and repair items on a council list (our estimate) | £1,500 – £5,000 | £1,600 – £5,300 | house |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £850 – £2,100 | house |
| FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted | £300 – £600 | £320 – £640 | door |
| EICR, 5+ bedroom house | £150 – £400 | £160 – £420 | inspection |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Ely can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Typical time on site: Set by the council’s deadline. We agree the programme with you before starting and send photo updates as the work progresses.
When do Ely landlords need it?
We usually get the call when:
- An improvement notice with a deadline
- A licence granted with conditions
Questions about licence condition and schedule-of-works in Ely
Do you deal with the council for me?
We give you the evidence and can talk the council through the works if you want. The licence and any correspondence stay in your name.
Which postcodes in Ely do you work in?
All of them, including CB6 and CB7, and the surrounding parts of Cambridgeshire.
Does a shared house in Ely need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much does licence condition and schedule-of-works cost in Ely?
Our guide ranges for East of England are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Licence condition and schedule-of-works near Ely
- Newmarket · 12 mi
- March · 13 mi
- Cambridge · 15 mi
- Wisbech · 19 mi
- Huntingdon · 20 mi
- Thetford · 21 mi
- All of Cambridgeshire
