HMORefurbishment

Tyne and Wear, England

Large HMO conversions (7+ sharers) in Felling

Planning large HMO conversions (7+ sharers) in Felling? We survey, price and build HMO works across Felling (NE8, NE10 and NE82) and the rest of Tyne and Wear.

Three-storey house under full scaffolding with guardrails and brick guards during refurbishment works

A large HMO is a shared house for seven or more people. In Felling, a town of about 34,000 people in Tyne and Wear, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Tyne and Wear, England
Postcodes
NE8, NE10 and NE82
Location
2 miles south-east of Newcastle upon Tyne
Pricing region
North East

What do large HMO conversions (7+ sharers) in Felling involve?

  • Emergency lighting where the escape route needs it
  • Ensuites or extra bathrooms
  • Fire alarm and detection system sized for the building
  • Second kitchen or extra kitchen capacity
  • Protected stair and landing with fire doors and fire stopping

Which rules apply in Felling?

Here is what usually applies to a Felling job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • Licensed HMOs must meet national minimum bedroom sizes: 6.51 m² for one person aged 10 or over, 10.22 m² for two, and 4.64 m² for a child under 10.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • 7 or more sharers is a sui generis large HMO and normally needs planning permission.

How much do large HMO conversions (7+ sharers) cost in Felling?

ItemUK typicalLocal guidePer
Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate)£3,500 – £6,500£3,200 – £6,000letting room
Panel alarm system (Grade A type), larger HMO£1,750 – £4,500£1,600 – £4,150house
Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate)£2,000 – £6,000£1,850 – £5,500house
Ensuite shower room added to a bedroom£4,000 – £10,000£3,700 – £9,200ensuite
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,350 – £16,550kitchen

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Felling can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: 10–20 weeks. We agree the programme with you before starting and send photo updates as the work progresses.

When do Felling landlords need it?

We usually get the call when:

  • A large house, three or more storeys, or a building with lots of rooms
  • An existing large HMO needs works before a licence renewal

Questions about large HMO conversions (7+ sharers) in Felling

Can you work with my architect?

Yes. We often build from an architect’s drawings, or we can recommend a designer to prepare them.

How far do you travel from Felling?

We cover the whole of Tyne and Wear and work UK-wide. For Felling the nearest towns on our list are Gateshead (1 miles), Newcastle upon Tyne (2 miles), Hebburn (3 miles).

Where do I check the HMO rules for an address in Felling?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do large HMO conversions (7+ sharers) cost in Felling?

Our guide ranges for North East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Large HMO conversions (7+ sharers) near Felling

Other HMO services in Felling

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote