- Nation
- Scotland
- Pricing region
- Scotland
- Postcode areas
- G
- Main towns
- Bearsden, Bishopbriggs, Kirkintilloch, Milngavie
What do void and between-tenancy refurbs in East Dunbartonshire involve?
- Pre-void walk-round and fixed-price list
- Repairs to doors, closers, locks and fittings
- Carpet, vinyl or laminate replacement
- Fire door, closer and alarm checks
- Kitchen and bathroom refresh
- Redecoration in hard-wearing finishes
Which rules apply in East Dunbartonshire?
- Councils set HMO fire standards through licence conditions, often including emergency lighting in larger HMOs.
- Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.
- Kitchen, WC and bathroom ratios come from council standards; one WC and one bath or shower per 5 people is a common figure.
Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.
How much do void and between-tenancy refurbs cost in East Dunbartonshire?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Between-tenancy turnaround per room: repairs, redecoration, flooring (our estimate) | £600 – £1,800 | £570 – £1,700 | room |
| Mould treatment and making good | £250 – £500 | £240 – £480 | room |
| FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted | £300 – £600 | £280 – £570 | door |
Typical time on site: 3–10 working days. For a figure for your house, try the guide-price tool.
Void and between-tenancy refurbs by town in East Dunbartonshire
Questions about void and between-tenancy refurbs in East Dunbartonshire
Can you book the summer turnaround in advance?
Yes, and it is worth doing: June to September is the busiest period for student houses. We can agree a programme and price in spring.
How quickly can you turn a room around?
A single room redecoration with flooring is often two to four working days. A whole house at the end of a tenancy is usually one to two weeks, depending on what the walk-round finds.
Do you carry out void and between-tenancy refurbs across East Dunbartonshire?
Yes, across the whole of East Dunbartonshire, including Bearsden, Bishopbriggs, Kirkintilloch.
Who licenses HMOs in East Dunbartonshire?
East Dunbartonshire council licenses HMOs in its area. Every HMO in Scotland needs a licence.
Other HMO services in East Dunbartonshire
- Bedroom upgrades and room refits in East Dunbartonshire
- Full HMO refurbishment in East Dunbartonshire
- Student HMO refurbishment in East Dunbartonshire
- Fire doors in East Dunbartonshire
- Damp, mould and HHSRS repairs in East Dunbartonshire
- Shared bathroom and shower room refits in East Dunbartonshire
- Ensuite installation in East Dunbartonshire
- Sound insulation in East Dunbartonshire
