HMORefurbishment

Greater Manchester, England

Void and between-tenancy refurbs in Oldham

Planning void and between-tenancy refurbs in Oldham? We survey, price and build HMO works across Oldham (OL1, OL2, OL8 and OL9) and the rest of Greater Manchester.

Empty bedroom being redecorated between tenancies, with dust sheets, ladder and new carpet

A void refurbishment is the work done while a room or house is empty between tenancies: repairs, redecoration, flooring, deep cleaning and safety checks, done quickly so the room can be let again. Landlords in Oldham (OL1, OL2, OL8 and OL9) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Greater Manchester, England
Postcodes
OL1, OL2, OL8 and OL9
Location
6 miles north-east of Manchester
Pricing region
North West

What do void and between-tenancy refurbs in Oldham involve?

  • Pre-void walk-round and fixed-price list
  • Final clean and photo report
  • Kitchen and bathroom refresh
  • Carpet, vinyl or laminate replacement
  • Repairs to doors, closers, locks and fittings

Which rules apply in Oldham?

Here is what usually applies to a Oldham job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.
  • National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.

How much do void and between-tenancy refurbs cost in Oldham?

ItemUK typicalLocal guidePer
Between-tenancy turnaround per room: repairs, redecoration, flooring (our estimate)£600 – £1,800£580 – £1,750room
Mould treatment and making good£250 – £500£240 – £480room
FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted£300 – £600£290 – £580door

Prices in Oldham are shown with our regional adjustment for North West (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Most jobs of this kind take 3–10 working days. If a council deadline applies in Oldham, tell us at the first call so the programme is built around it.

When do Oldham landlords need it?

We usually get the call when:

  • End of the student year in summer
  • Before re-letting a house you have just bought

Questions about void and between-tenancy refurbs in Oldham

Can you book the summer turnaround in advance?

Yes, and it is worth doing: June to September is the busiest period for student houses. We can agree a programme and price in spring.

Which postcodes in Oldham do you work in?

All of them, including OL1, OL2, OL8 and OL9, and the surrounding parts of Greater Manchester.

Does a shared house in Oldham need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do void and between-tenancy refurbs cost in Oldham?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Void and between-tenancy refurbs near Oldham

Other HMO services in Oldham

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote