HMORefurbishment

Scotland

Full HMO refurbishment across Clackmannanshire

Stripping out and refurbishing a tired or failing shared house from top to bottom. Covering all of Clackmannanshire, with a free site visit and fixed written quote.

Refurbished communal lounge and dining area in a shared house
In short: A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Across Clackmannanshire, the work is planned around Scotland’s HMO rules and the standards the local council publishes.
Nation
Scotland
Pricing region
Scotland
Postcode areas
FK
Main towns
Alloa

What does full HMO refurbishment in Clackmannanshire involve?

  • Strip-out and making good
  • Rewire or electrical upgrades
  • Fire doors, detection and escape route upgrades
  • New or refitted kitchens and bathrooms
  • Damp and mould repairs
  • Heating and hot water upgrades

Which rules apply in Clackmannanshire?

  • Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
  • Kitchen, WC and bathroom ratios come from council standards; one WC and one bath or shower per 5 people is a common figure.
  • Councils set HMO fire standards through licence conditions, often including emergency lighting in larger HMOs.
  • An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
  • Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.

Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.

How much does full HMO refurbishment cost in Clackmannanshire?

Regional adjustment for Scotland. Planning budgets: see our prices page.
ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£3,800 – £8,550letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,600 – £17,100kitchen
Shared bathroom refit£5,500 – £9,000£5,200 – £8,550bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£760 – £1,900house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,700 – £11,400house

Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.

Full HMO refurbishment by town in Clackmannanshire

Questions about full HMO refurbishment in Clackmannanshire

Will you deal with the council’s list of works?

Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Do you carry out full HMO refurbishment across Clackmannanshire?

Yes, across the whole of Clackmannanshire, including Alloa.

Who licenses HMOs in Clackmannanshire?

Clackmannanshire council licenses HMOs in its area. Every HMO in Scotland needs a licence.

Other HMO services in Clackmannanshire

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote