HMORefurbishment

East Sussex, England

Full HMO refurbishment in Crowborough

Full HMO refurbishment for shared houses in Crowborough: survey, itemised quote, works and a licence-ready handover, covering TN3 and TN6.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. For a house in Crowborough we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
East Sussex, England
Postcodes
TN3 and TN6
Location
21 miles north-east of Brighton
Pricing region
South East

What does full HMO refurbishment in Crowborough involve?

  • Strip-out and making good
  • New or refitted kitchens and bathrooms
  • Heating and hot water upgrades
  • Fire doors, detection and escape route upgrades
  • Rewire or electrical upgrades

Which rules apply in Crowborough?

Here is what usually applies to a Crowborough job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.

How much does full HMO refurbishment cost in Crowborough?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£4,500 – £10,100letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£8,950 – £20,150kitchen
Shared bathroom refit£5,500 – £9,000£6,150 – £10,100bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,700 – £13,450house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Crowborough can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Most jobs of this kind take 4–12 weeks. If a council deadline applies in Crowborough, tell us at the first call so the programme is built around it.

When do Crowborough landlords need it?

We usually get the call when:

  • A council inspection or licence renewal has listed defects
  • A house that has been let hard for years

Questions about full HMO refurbishment in Crowborough

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Which postcodes in Crowborough do you work in?

All of them, including TN3 and TN6, and the surrounding parts of East Sussex.

Does a shared house in Crowborough need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much does full HMO refurbishment cost in Crowborough?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Crowborough

Other HMO services in Crowborough

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote