A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Landlords in Southall (UB1, UB2, UB6 and UB18) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.
- Area
- Greater London, England
- Postcodes
- UB1, UB2, UB6 and UB18
- Location
- 11 miles west of London
- Council
- London Borough of Ealing
- Pricing region
- London
What does full HMO refurbishment in Southall involve?
- Damp and mould repairs
- Fire doors, detection and escape route upgrades
- Heating and hot water upgrades
- Decoration, flooring and furniture-ready rooms
- New or refitted kitchens and bathrooms
Which rules apply in Southall?
Here is what usually applies to a Southall job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
London Borough of Ealing: local HMO schemes
| Article 4 (HMO) | In force across the council area Immediate direction for Perivale from 30 Oct 2024 and non-immediate direction for the rest of the borough from 2025. |
|---|---|
| Additional licensing | In force across the council area Borough-wide additional licensing 1 Apr 2022-31 Mar 2027; renewal consulted 15 Jul-24 Sep 2026. |
| Selective licensing | In force in part of the council area Two designations covering most wards: 1 Apr 2022-31 Mar 2027 (e.g. Southall, East/North Acton) and 3 Jan 2023-2 Jan 2028 (e.g. Greenford, Northolt, Perivale, Ealing Common). |
Schemes change. Check the council’s current pages for the exact address in Southall before you buy or start work. Source: London Borough of Ealing HMO licensing page, checked 2026-10-31.
How much does full HMO refurbishment cost in Southall?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £5,100 – £11,500 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £10,250 – £23,050 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £7,050 – £11,500 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £1,000 – £2,550 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £7,700 – £15,350 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Southall can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Most jobs of this kind take 4–12 weeks. If a council deadline applies in Southall, tell us at the first call so the programme is built around it.
When do Southall landlords need it?
We usually get the call when:
- A council inspection or licence renewal has listed defects
- You have bought an existing HMO that needs work
Questions about full HMO refurbishment in Southall
Can you refurbish an HMO while tenants live there?
Sometimes, room by room, with the escape route kept clear and the fire alarm working at all times. For heavier work it is usually quicker and safer to do it with the house empty. We plan the phasing with you.
How far do you travel from Southall?
We cover the whole of Greater London and work UK-wide. For Southall the nearest towns on our list are Greenford (2 miles), Heston (2 miles), Hayes (2 miles).
Which council covers HMOs in Southall?
Southall is covered by London Borough of Ealing. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much does full HMO refurbishment cost in Southall?
Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Full HMO refurbishment near Southall
- Greenford · 2 mi
- Heston · 2 mi
- Hayes · 2 mi
- Isleworth · 3 mi
- Northolt · 3 mi
- Hounslow · 3 mi
- All of Greater London
Other HMO services in Southall
- Void and between-tenancy refurbs in Southall
- HMO fire safety upgrades in Southall
- Rewires and EICR remedials in Southall
- Communal kitchen refits in Southall
- Shared bathroom and shower room refits in Southall
- Damp, mould and HHSRS repairs in Southall
- Licence condition and schedule-of-works in Southall
- Fire alarm and detection systems in Southall
