HMORefurbishment

Kent, England

Full HMO refurbishment in Folkestone

Full HMO refurbishment in Folkestone and the CT19, CT20 and CT50 postcode areas, for landlords and investors with shared houses across Kent. Free site visit, then a fixed written quote.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Folkestone is 60 miles east of Brighton. We price full HMO refurbishment there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Kent, England
Postcodes
CT19, CT20 and CT50
Location
60 miles east of Brighton
Pricing region
South East

What does full HMO refurbishment in Folkestone involve?

  • Heating and hot water upgrades
  • Fire doors, detection and escape route upgrades
  • Damp and mould repairs
  • Decoration, flooring and furniture-ready rooms
  • Rewire or electrical upgrades

Which rules apply in Folkestone?

Here is what usually applies to a Folkestone job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.

How much does full HMO refurbishment cost in Folkestone?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£4,500 – £10,100letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£8,950 – £20,150kitchen
Shared bathroom refit£5,500 – £9,000£6,150 – £10,100bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,700 – £13,450house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Folkestone can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 4–12 weeks on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Folkestone landlords need it?

Typical reasons for this work in Folkestone:

  • You have bought an existing HMO that needs work
  • A house that has been let hard for years

Questions about full HMO refurbishment in Folkestone

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Which postcodes in Folkestone do you work in?

All of them, including CT19, CT20 and CT50, and the surrounding parts of Kent.

Where do I check the HMO rules for an address in Folkestone?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Folkestone?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Folkestone

Other HMO services in Folkestone

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote