A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Landlords in Strood (ME1 and ME2) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.
- Area
- Kent, England
- Postcodes
- ME1 and ME2
- Location
- 27 miles east of London
- Council
- Medway Council
- Pricing region
- South East
What does full HMO refurbishment in Strood involve?
- Heating and hot water upgrades
- Decoration, flooring and furniture-ready rooms
- Strip-out and making good
- Damp and mould repairs
- Rewire or electrical upgrades
Which rules apply in Strood?
Full HMO refurbishment in Strood must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
- Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
Medway Council: local HMO schemes
| Article 4 (HMO) | In force in part of the council area Article 4 Direction for seven wards (Chatham Central & Brompton, Fort Pitt, Gillingham North/South, Luton, Strood North & Frindsbury, Watling), approved 16 Dec 2025, in force Jan 2026. |
|---|---|
| Additional licensing | Approved, starts 4 Jan 2027 Six wards (Chatham Central & Brompton, Fort Pitt, Gillingham North and South, Luton, Watling), 4 Jan 2027 to 3 Jan 2032. |
| Selective licensing | Approved, starts 4 Jan 2027 Seven wards (as additional licensing plus Strood North & Frindsbury), 4 Jan 2027 to 3 Jan 2032. |
Schemes change. Check the council’s current pages for the exact address in Strood before you buy or start work. Source: Medway Council HMO licensing page, checked 2026-10-31.
How much does full HMO refurbishment cost in Strood?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £4,500 – £10,100 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £8,950 – £20,150 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £6,150 – £10,100 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £900 – £2,250 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,700 – £13,450 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Strood can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Most jobs of this kind take 4–12 weeks. If a council deadline applies in Strood, tell us at the first call so the programme is built around it.
When do Strood landlords need it?
Landlords in Strood most often ask us for this when:
- A house that has been let hard for years
- A council inspection or licence renewal has listed defects
Questions about full HMO refurbishment in Strood
Will you deal with the council’s list of works?
Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.
Do you cover all of Strood?
Yes. We work across Strood and the ME1 and ME2 postcode areas, plus the rest of Kent. Nearby places we also cover include Rochester, Chatham, Gillingham.
Which council covers HMOs in Strood?
Strood is covered by Medway Council. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much does full HMO refurbishment cost in Strood?
Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Full HMO refurbishment near Strood
- Rochester · 1 mi
- Chatham · 2 mi
- Gillingham · 3 mi
- Gravesend · 6 mi
- Grays · 9 mi
- Maidstone · 9 mi
- All of Kent
Other HMO services in Strood
- Void and between-tenancy refurbs in Strood
- HMO fire safety upgrades in Strood
- Rewires and EICR remedials in Strood
- Communal kitchen refits in Strood
- Shared bathroom and shower room refits in Strood
- Damp, mould and HHSRS repairs in Strood
- Large HMO conversions (7+ sharers) in Strood
- EPC and energy upgrades in Strood
