A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Landlords in Rochester (ME1, ME2 and ME4) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.
- Area
- Kent, England
- Postcodes
- ME1, ME2 and ME4
- Location
- 28 miles east of London
- Council
- Medway Council
- Pricing region
- South East
What does full HMO refurbishment in Rochester involve?
- Damp and mould repairs
- Rewire or electrical upgrades
- New or refitted kitchens and bathrooms
- Decoration, flooring and furniture-ready rooms
- Strip-out and making good
Which rules apply in Rochester?
The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Rochester before we price.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
Medway Council: local HMO schemes
| Article 4 (HMO) | In force in part of the council area Article 4 Direction for seven wards (Chatham Central & Brompton, Fort Pitt, Gillingham North/South, Luton, Strood North & Frindsbury, Watling), approved 16 Dec 2025, in force Jan 2026. |
|---|---|
| Additional licensing | Approved, starts 4 Jan 2027 Six wards (Chatham Central & Brompton, Fort Pitt, Gillingham North and South, Luton, Watling), 4 Jan 2027 to 3 Jan 2032. |
| Selective licensing | Approved, starts 4 Jan 2027 Seven wards (as additional licensing plus Strood North & Frindsbury), 4 Jan 2027 to 3 Jan 2032. |
Schemes change. Check the council’s current pages for the exact address in Rochester before you buy or start work. Source: Medway Council HMO licensing page, checked 2026-10-31.
How much does full HMO refurbishment cost in Rochester?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £4,500 – £10,100 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £8,950 – £20,150 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £6,150 – £10,100 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £900 – £2,250 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,700 – £13,450 | house |
These are typical ranges including VAT, adjusted for South East, where costs run above the UK average. The fixed price for a house in Rochester follows a site visit.
How long does it take?
Typical time on site: 4–12 weeks. We agree the programme with you before starting and send photo updates as the work progresses.
When do Rochester landlords need it?
We usually get the call when:
- You have bought an existing HMO that needs work
- A council inspection or licence renewal has listed defects
Questions about full HMO refurbishment in Rochester
Do you provide certificates at the end?
Yes: electrical and fire alarm certificates, and building control completion where it applies.
Which postcodes in Rochester do you work in?
All of them, including ME1, ME2 and ME4, and the surrounding parts of Kent.
Which council covers HMOs in Rochester?
Rochester is covered by Medway Council. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much does full HMO refurbishment cost in Rochester?
Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Full HMO refurbishment near Rochester
- Chatham · 1 mi
- Strood · 1 mi
- Gillingham · 2 mi
- Gravesend · 7 mi
- Maidstone · 8 mi
- Stanford-le-Hope · 10 mi
- All of Kent
Other HMO services in Rochester
- Void and between-tenancy refurbs in Rochester
- HMO fire safety upgrades in Rochester
- Rewires and EICR remedials in Rochester
- Communal kitchen refits in Rochester
- Shared bathroom and shower room refits in Rochester
- Damp, mould and HHSRS repairs in Rochester
- Bedroom upgrades and room refits in Rochester
- Ensuite installation in Rochester
