HMORefurbishment

Merseyside, England

Full HMO refurbishment in Wallasey

We carry out full HMO refurbishment in Wallasey, 4 miles west of Liverpool, working to the HMO rules that apply in England and to the council’s written HMO standards.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. In Wallasey, a town of around 60,000 people in Merseyside, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Merseyside, England
Postcodes
CH27, CH44 and CH45
Location
4 miles west of Liverpool
Pricing region
North West

What does full HMO refurbishment in Wallasey involve?

  • Condition survey and schedule of works
  • Damp and mould repairs
  • New or refitted kitchens and bathrooms
  • Heating and hot water upgrades
  • Strip-out and making good

Which rules apply in Wallasey?

Full HMO refurbishment in Wallasey must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.

How much does full HMO refurbishment cost in Wallasey?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£3,850 – £8,650letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,700 – £17,300kitchen
Shared bathroom refit£5,500 – £9,000£5,300 – £8,650bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£770 – £1,900house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

These are typical ranges including VAT, adjusted for North West, where costs run below the UK average. The fixed price for a house in Wallasey follows a site visit.

How long does it take?

Allow 4–12 weeks on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Wallasey landlords need it?

Landlords in Wallasey most often ask us for this when:

  • You have bought an existing HMO that needs work
  • A house that has been let hard for years

Questions about full HMO refurbishment in Wallasey

Can you refurbish an HMO while tenants live there?

Sometimes, room by room, with the escape route kept clear and the fire alarm working at all times. For heavier work it is usually quicker and safer to do it with the house empty. We plan the phasing with you.

How far do you travel from Wallasey?

We cover the whole of Merseyside and work UK-wide. For Wallasey the nearest towns on our list are Birkenhead (3 miles), Bootle (4 miles), Liverpool (4 miles).

Where do I check the HMO rules for an address in Wallasey?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Wallasey?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Wallasey

Other HMO services in Wallasey

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote