HMORefurbishment

Scotland

Full HMO refurbishment across Shetland Islands

Stripping out and refurbishing a tired or failing shared house from top to bottom. Covering all of Shetland Islands, with a free site visit and fixed written quote.

Refurbished communal lounge and dining area in a shared house
In short: A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Across Shetland Islands, the work is planned around Scotland’s HMO rules and the standards the local council publishes.
Nation
Scotland
Pricing region
Scotland
Postcode areas
ZE

What does full HMO refurbishment in Shetland Islands involve?

  • New or refitted kitchens and bathrooms
  • Strip-out and making good
  • Condition survey and schedule of works
  • Rewire or electrical upgrades
  • Damp and mould repairs
  • Heating and hot water upgrades

Which rules apply in Shetland Islands?

  • Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
  • Kitchen, WC and bathroom ratios come from council standards; one WC and one bath or shower per 5 people is a common figure.
  • Councils set HMO fire standards through licence conditions, often including emergency lighting in larger HMOs.
  • An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
  • Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.

Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.

How much does full HMO refurbishment cost in Shetland Islands?

Regional adjustment for Scotland. Planning budgets: see our prices page.
ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£3,800 – £8,550letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,600 – £17,100kitchen
Shared bathroom refit£5,500 – £9,000£5,200 – £8,550bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£760 – £1,900house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,700 – £11,400house

Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.

Questions about full HMO refurbishment in Shetland Islands

Will you deal with the council’s list of works?

Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.

How much does a full HMO refurbishment cost?

It depends on size and condition. Our guide prices page shows typical UK ranges per room and per square metre, and we give a fixed written quote after a site visit.

Do you carry out full HMO refurbishment across Shetland Islands?

Yes, across the whole of Shetland Islands.

Who licenses HMOs in Shetland Islands?

Shetland Islands council licenses HMOs in its area. Every HMO in Scotland needs a licence.

Other HMO services in Shetland Islands

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote