HMORefurbishment

England · Yorkshire and the Humber

Full HMO refurbishment across West Yorkshire

Stripping out and refurbishing a tired or failing shared house from top to bottom. Covering all of West Yorkshire, with a free site visit and fixed written quote.

Refurbished communal lounge and dining area in a shared house
In short: A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Across West Yorkshire, the work is planned around England’s HMO rules and the standards the local council publishes.
Nation
England
Pricing region
Yorkshire and the Humber
Postcode areas
LS, WF, BD, HD
Main towns
Leeds, Bradford, Huddersfield, Wakefield, Halifax

What does full HMO refurbishment in West Yorkshire involve?

  • Fire doors, detection and escape route upgrades
  • Heating and hot water upgrades
  • New or refitted kitchens and bathrooms
  • Condition survey and schedule of works
  • Strip-out and making good
  • Decoration, flooring and furniture-ready rooms

Which rules apply in West Yorkshire?

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in West Yorkshire?

Regional adjustment for Yorkshire and the Humber. Planning budgets: see our prices page.
ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£3,800 – £8,550letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,600 – £17,100kitchen
Shared bathroom refit£5,500 – £9,000£5,200 – £8,550bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£760 – £1,900house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,700 – £11,400house

Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.

Full HMO refurbishment by town in West Yorkshire

Questions about full HMO refurbishment in West Yorkshire

Can you refurbish an HMO while tenants live there?

Sometimes, room by room, with the escape route kept clear and the fire alarm working at all times. For heavier work it is usually quicker and safer to do it with the house empty. We plan the phasing with you.

Will you deal with the council’s list of works?

Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.

Do you carry out full HMO refurbishment across West Yorkshire?

Yes, across the whole of West Yorkshire, including Leeds, Bradford, Huddersfield.

Who licenses HMOs in West Yorkshire?

HMOs in West Yorkshire are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.

Other HMO services in West Yorkshire

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote