HMO electrical works keep the wiring in a shared house safe and certificated. In Long Eaton, a town of around 50,000 people in Derbyshire, the work is planned around the HMO rules for England and the council’s written HMO standards.
- Area
- Derbyshire, England
- Postcodes
- NG9 and NG10
- Location
- 6 miles south-west of Nottingham
- Pricing region
- East Midlands
What do rewires and EICR remedials in Long Eaton involve?
- EICR remedial works with confirmation
- Full or partial rewires
- Bathroom and kitchen circuits
- Extra sockets and USB points in rooms
- Electrical installation certificates
Which rules apply in Long Eaton?
Here is what usually applies to a Long Eaton job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
How much do rewires and EICR remedials cost in Long Eaton?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £150 – £390 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £680 – £1,350 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,800 – £11,650 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Long Eaton can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.
When do Long Eaton landlords need it?
We usually get the call when:
- Converting or adding rooms
- Old wiring or an old fuse board
Questions about rewires and EICR remedials in Long Eaton
How long do I have to fix EICR items?
In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.
How far do you travel from Long Eaton?
We cover the whole of Derbyshire and work UK-wide. For Long Eaton the nearest towns on our list are Ilkeston (5 miles), Nottingham (6 miles), West Bridgford (6 miles).
Does a shared house in Long Eaton need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much do rewires and EICR remedials cost in Long Eaton?
Our guide ranges for East Midlands are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Long Eaton
- Ilkeston · 5 mi
- Nottingham · 6 mi
- West Bridgford · 6 mi
- Heanor · 9 mi
- Derby · 9 mi
- Arnold · 9 mi
- All of Derbyshire
Other HMO services in Long Eaton
- Fire alarm and detection systems in Long Eaton
- Licence condition and schedule-of-works in Long Eaton
- Full HMO refurbishment in Long Eaton
- House to HMO conversion in Long Eaton
- Bedroom upgrades and room refits in Long Eaton
- Escape routes, emergency lighting and fire stopping in Long Eaton
- Fire doors in Long Eaton
- Ensuite installation in Long Eaton
