HMO electrical works keep the wiring in a shared house safe and certificated. In Beckenham, a town of around 60,000 people in Greater London, the work is planned around the HMO rules for England and the council’s written HMO standards.
- Area
- Greater London, England
- Postcodes
- BR3, SE20 and SE25
- Location
- 8 miles south-east of London
- Pricing region
- London
What do rewires and EICR remedials in Beckenham involve?
- EICR remedial works with confirmation
- Extra sockets and USB points in rooms
- Consumer unit replacement
- Emergency lighting circuits
- Electrical installation certificates
Which rules apply in Beckenham?
Here is what usually applies to a Beckenham job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
How much do rewires and EICR remedials cost in Beckenham?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £190 – £510 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £900 – £1,800 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £7,700 – £15,350 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Beckenham can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.
When do Beckenham landlords need it?
Typical reasons for this work in Beckenham:
- Converting or adding rooms
- Old wiring or an old fuse board
Questions about rewires and EICR remedials in Beckenham
How often does an HMO need an EICR?
At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.
Do you cover all of Beckenham?
Yes. We work across Beckenham and the BR3, SE20 and SE25 postcode areas, plus the rest of Greater London. Nearby places we also cover include Catford, Croydon, Blackheath.
Does a shared house in Beckenham need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much do rewires and EICR remedials cost in Beckenham?
Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Beckenham
- Catford · 3 mi
- Croydon · 4 mi
- Blackheath · 4 mi
- South Croydon · 4 mi
- Eltham · 4 mi
- Streatham · 5 mi
- All of Greater London
Other HMO services in Beckenham
- Fire alarm and detection systems in Beckenham
- Licence condition and schedule-of-works in Beckenham
- Full HMO refurbishment in Beckenham
- House to HMO conversion in Beckenham
- Bedroom upgrades and room refits in Beckenham
- Escape routes, emergency lighting and fire stopping in Beckenham
- HMO fire safety upgrades in Beckenham
- Ensuite installation in Beckenham
