HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Streatham we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.
- Area
- Greater London, England
- Postcodes
- SW2 and SW16
- Location
- 5 miles south of London
- Pricing region
- London
What do rewires and EICR remedials in Streatham involve?
- Full or partial rewires
- Electrical installation certificates
- Bathroom and kitchen circuits
- Extra sockets and USB points in rooms
- Emergency lighting circuits
Which rules apply in Streatham?
Here is what usually applies to a Streatham job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
How much do rewires and EICR remedials cost in Streatham?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £190 – £510 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £900 – £1,800 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £7,700 – £15,350 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Streatham can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.
When do Streatham landlords need it?
Typical reasons for this work in Streatham:
- An EICR with C1, C2 or FI items
- Old wiring or an old fuse board
Questions about rewires and EICR remedials in Streatham
How often does an HMO need an EICR?
At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.
Do you cover all of Streatham?
Yes. We work across Streatham and the SW2 and SW16 postcode areas, plus the rest of Greater London. Nearby places we also cover include Mitcham, Brixton, Wimbledon.
Does a shared house in Streatham need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much do rewires and EICR remedials cost in Streatham?
Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Streatham
- Mitcham · 2 mi
- Brixton · 3 mi
- Wimbledon · 3 mi
- Battersea · 3 mi
- Croydon · 3 mi
- Morden · 4 mi
- All of Greater London
Other HMO services in Streatham
- Fire alarm and detection systems in Streatham
- Licence condition and schedule-of-works in Streatham
- Full HMO refurbishment in Streatham
- House to HMO conversion in Streatham
- Bedroom upgrades and room refits in Streatham
- Escape routes, emergency lighting and fire stopping in Streatham
- EPC and energy upgrades in Streatham
- Extensions for extra rooms in Streatham
