HMORefurbishment

Lancashire, England

Rewires and EICR remedials in Accrington

Rewires and EICR remedials for shared houses in Accrington: survey, itemised quote, works and a licence-ready handover, covering BB5.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Accrington (BB5) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Lancashire, England
Postcodes
BB5
Location
14 miles east of Preston
Pricing region
North West

What do rewires and EICR remedials in Accrington involve?

  • Bathroom and kitchen circuits
  • Emergency lighting circuits
  • Full or partial rewires
  • Consumer unit replacement
  • Extra sockets and USB points in rooms

Which rules apply in Accrington?

Here is what usually applies to a Accrington job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Accrington?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£670 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Accrington can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Accrington landlords need it?

We usually get the call when:

  • An EICR with C1, C2 or FI items
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Accrington

Do you issue certificates?

Yes: installation or minor works certificates and written confirmation of remedials, issued by the qualified electrician who did the work.

Which postcodes in Accrington do you work in?

All of them, including BB5, and the surrounding parts of Lancashire.

Does a shared house in Accrington need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Accrington?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Accrington

Other HMO services in Accrington

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote