HMORefurbishment

Lancashire, England

Rewires and EICR remedials in Burnley

Planning rewires and EICR remedials in Burnley? We survey, price and build HMO works across Burnley (BB10 and BB11) and the rest of Lancashire.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Burnley we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately. With students as well as working sharers renting in Burnley, we plan bigger jobs for the gap between academic-year tenancies where we can.

Area
Lancashire, England
Postcodes
BB10 and BB11
Location
19 miles east of Preston
Pricing region
North West

What do rewires and EICR remedials in Burnley involve?

  • EICR remedial works with confirmation
  • Extra sockets and USB points in rooms
  • Bathroom and kitchen circuits
  • Emergency lighting circuits
  • Electrical installation certificates

Which rules apply in Burnley?

Here is what usually applies to a Burnley job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.

How much do rewires and EICR remedials cost in Burnley?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£670 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Burnley can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

If the house is let to students, we work backwards from the next tenancy start date in Burnley.

When do Burnley landlords need it?

We usually get the call when:

  • An EICR with C1, C2 or FI items
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Burnley

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

Do you cover all of Burnley?

Yes. We work across Burnley and the BB10 and BB11 postcode areas, plus the rest of Lancashire. Nearby places we also cover include Nelson (Lancashire), Colne, Accrington.

Does a shared house in Burnley need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Burnley?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Burnley

Other HMO services in Burnley

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote