HMORefurbishment

Warwickshire, England

Rewires and EICR remedials in Bedworth

Rewires and EICR remedials in Bedworth and the CV7 and CV12 postcode areas, for landlords and investors with shared houses across Warwickshire. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Bedworth we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Warwickshire, England
Postcodes
CV7 and CV12
Location
5 miles north of Coventry
Pricing region
West Midlands

What do rewires and EICR remedials in Bedworth involve?

  • EICR remedial works with confirmation
  • Electrical installation certificates
  • Full or partial rewires
  • Consumer unit replacement
  • Extra sockets and USB points in rooms

Which rules apply in Bedworth?

Here is what usually applies to a Bedworth job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Bedworth?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£150 – £400inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£700 – £1,400house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,000 – £12,000house

These are typical ranges including VAT, adjusted for West Midlands, where costs run in line with the UK average. The fixed price for a house in Bedworth follows a site visit.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Bedworth landlords need it?

Typical reasons for this work in Bedworth:

  • Converting or adding rooms
  • An EICR with C1, C2 or FI items

Questions about rewires and EICR remedials in Bedworth

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

Which postcodes in Bedworth do you work in?

All of them, including CV7 and CV12, and the surrounding parts of Warwickshire.

Does a shared house in Bedworth need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Bedworth?

Our guide ranges for West Midlands are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Bedworth

Other HMO services in Bedworth

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote