HMORefurbishment

Cambridgeshire, England

EPC and energy upgrades in March

EPC and energy upgrades in March and the PE15 postcode areas, for landlords and investors with shared houses across Cambridgeshire. Free site visit, then a fixed written quote.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. For a house in March we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Cambridgeshire, England
Postcodes
PE15
Location
14 miles east of Peterborough
Pricing region
East of England

What do EPC and energy upgrades in March involve?

  • Double or secondary glazing
  • Loft and roof insulation
  • Heating, hot water and smart controls
  • Ventilation to control condensation
  • Internal or external wall insulation

Which rules apply in March?

EPC and energy upgrades in March must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Rented homes must currently meet at least EPC E, with a £3,500 spending cap. The government plans EPC C by October 2030, subject to legislation.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.

How much do EPC and energy upgrades cost in March?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£690 – £1,300house
Internal wall insulation£60 – £100£60 – £110m² of wall

Use these as a starting point for budgeting. Access, condition and the council’s requirements in March can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do March landlords need it?

We usually get the call when:

  • High bills in an all-inclusive rent
  • Planning ahead for higher standards

Questions about EPC and energy upgrades in March

Are there grants?

Some schemes support landlords. Eligibility changes, so check the current government and energy company schemes for your nation.

How far do you travel from March?

We cover the whole of Cambridgeshire and work UK-wide. For March the nearest towns on our list are Wisbech (8 miles), Ely (13 miles), Peterborough (14 miles).

Does a shared house in March need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do EPC and energy upgrades cost in March?

Our guide ranges for East of England are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near March

Other HMO services in March

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote