HMORefurbishment

County Tyrone, Northern Ireland

Licence condition and schedule-of-works in Omagh

Licence condition and schedule-of-works for shared houses in Omagh: survey, itemised quote, works and a licence-ready handover, covering BT78, BT79 and BT81.

Newly fitted fire door with intumescent strips, smoke seals and overhead closer

Licence condition works are the jobs a council asks for before or after granting an HMO licence: things like extra detection, fire doors, a second bathroom, kitchen changes or repairs. In Omagh, a town of about 21,000 people in County Tyrone, the work is planned around the HMO rules for Northern Ireland and the NI HMO standards and licence conditions.

Area
County Tyrone, Northern Ireland
Postcodes
BT78, BT79 and BT81
Location
28 miles south of Derry
Pricing region
Northern Ireland

What does licence condition and schedule-of-works in Omagh involve?

  • A completion letter for your licence file
  • Liaison with you before the council revisits
  • Certificates and photos for each item
  • Fire safety, amenity and repair works
  • Advice on items that need a specialist

Which rules apply in Omagh?

Licence condition and schedule-of-works in Omagh must satisfy national law for Northern Ireland, the NI HMO standards and licence conditions and, where walls, drainage or fire separation change, the building rules. In short:

  • Licences usually last 5 years, and landlords must also register with the NI landlord registration scheme.
  • The NIFRS HMO Fire Safety Guide (July 2026) usually expects Grade D1 interlinked detection in smaller shared houses and a Grade A system with more than 6 occupants or over 200 m².
  • Kitchens, bathrooms and WCs must meet the 2019 living accommodation standard regulations and licence conditions.
  • Licence conditions and council enforcement cover disrepair, damp and mould in licensed HMOs.

How much does licence condition and schedule-of-works cost in Omagh?

ItemUK typicalLocal guidePer
Typical allowance for minor amenity and repair items on a council list (our estimate)£1,500 – £5,000£1,350 – £4,500house
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£720 – £1,800house
FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted£300 – £600£270 – £540door
EICR, 5+ bedroom house£150 – £400£140 – £360inspection

Prices in Omagh are shown with our regional adjustment for Northern Ireland (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Most jobs of this kind take Set by the council’s deadline. If a council deadline applies in Omagh, tell us at the first call so the programme is built around it.

When do Omagh landlords need it?

We usually get the call when:

  • An improvement notice with a deadline
  • An inspection letter or schedule of works

Questions about licence condition and schedule-of-works in Omagh

Can you help with an improvement notice?

Yes. We carry out the works listed in the notice and give you evidence of completion. Legal questions about the notice are for your adviser.

Which postcodes in Omagh do you work in?

All of them, including BT78, BT79 and BT81, and the surrounding parts of County Tyrone.

Where do I check the HMO rules for an address in Omagh?

With the local council for the address. In Northern Ireland, licensing is run centrally by the NI HMO Unit, and all new HMOs need planning permission and building control approval from the local council.

How much does licence condition and schedule-of-works cost in Omagh?

Our guide ranges for Northern Ireland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Licence condition and schedule-of-works near Omagh

Other HMO services in Omagh

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote