HMORefurbishment

Greater London, England

Licence condition and schedule-of-works in Hayes

Licence condition and schedule-of-works for shared houses in Hayes: survey, itemised quote, works and a licence-ready handover, covering UB3, UB4, UB8 and UB11.

Newly fitted fire door with intumescent strips, smoke seals and overhead closer

Licence condition works are the jobs a council asks for before or after granting an HMO licence: things like extra detection, fire doors, a second bathroom, kitchen changes or repairs. Hayes is 13 miles west of London. We price licence condition and schedule-of-works there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Greater London, England
Postcodes
UB3, UB4, UB8 and UB11
Location
13 miles west of London
Pricing region
London

What does licence condition and schedule-of-works in Hayes involve?

  • Fire safety, amenity and repair works
  • Liaison with you before the council revisits
  • Certificates and photos for each item
  • A completion letter for your licence file
  • Item-by-item price against the council’s list

Which rules apply in Hayes?

Licence condition and schedule-of-works in Hayes must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

How much does licence condition and schedule-of-works cost in Hayes?

ItemUK typicalLocal guidePer
Typical allowance for minor amenity and repair items on a council list (our estimate)£1,500 – £5,000£1,900 – £6,400house
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£1,000 – £2,550house
FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted£300 – £600£380 – £770door
EICR, 5+ bedroom house£150 – £400£190 – £510inspection

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Hayes can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: Set by the council’s deadline. We agree the programme with you before starting and send photo updates as the work progresses.

When do Hayes landlords need it?

Typical reasons for this work in Hayes:

  • A licence granted with conditions
  • An inspection letter or schedule of works

Questions about licence condition and schedule-of-works in Hayes

Can you meet a council deadline?

In most cases, yes, if we see the list early. Send it to us as soon as you get it and we will tell you straight away if a deadline looks tight.

Which postcodes in Hayes do you work in?

All of them, including UB3, UB4, UB8 and UB11, and the surrounding parts of Greater London.

Does a shared house in Hayes need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much does licence condition and schedule-of-works cost in Hayes?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Licence condition and schedule-of-works near Hayes

Other HMO services in Hayes

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote