HMORefurbishment

Surrey, England

Licence condition and schedule-of-works in Aldershot

Licence condition and schedule-of-works for shared houses in Aldershot: survey, itemised quote, works and a licence-ready handover, covering GU10, GU11 and GU12.

Newly fitted fire door with intumescent strips, smoke seals and overhead closer

Licence condition works are the jobs a council asks for before or after granting an HMO licence: things like extra detection, fire doors, a second bathroom, kitchen changes or repairs. In Aldershot, a town of around 40,000 people in Surrey, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Surrey, England
Postcodes
GU10, GU11 and GU12
Location
17 miles south-east of Reading
Pricing region
South East

What does licence condition and schedule-of-works in Aldershot involve?

  • A completion letter for your licence file
  • Fire safety, amenity and repair works
  • Liaison with you before the council revisits
  • Item-by-item price against the council’s list
  • Advice on items that need a specialist

Which rules apply in Aldershot?

The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Aldershot before we price.

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
  • National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

How much does licence condition and schedule-of-works cost in Aldershot?

ItemUK typicalLocal guidePer
Typical allowance for minor amenity and repair items on a council list (our estimate)£1,500 – £5,000£1,700 – £5,600house
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted£300 – £600£340 – £670door
EICR, 5+ bedroom house£150 – £400£170 – £450inspection

Prices in Aldershot are shown with our regional adjustment for South East (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: Set by the council’s deadline. We agree the programme with you before starting and send photo updates as the work progresses.

When do Aldershot landlords need it?

Landlords in Aldershot most often ask us for this when:

  • An improvement notice with a deadline
  • A licence granted with conditions

Questions about licence condition and schedule-of-works in Aldershot

Can you help with an improvement notice?

Yes. We carry out the works listed in the notice and give you evidence of completion. Legal questions about the notice are for your adviser.

Which postcodes in Aldershot do you work in?

All of them, including GU10, GU11 and GU12, and the surrounding parts of Surrey.

Does a shared house in Aldershot need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much does licence condition and schedule-of-works cost in Aldershot?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Licence condition and schedule-of-works near Aldershot

Other HMO services in Aldershot

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote