- Area
- Greater London
- Nation
- England
- Postcodes
- UB6 and W7
- Location
- 10 miles west of London
- Council
- London Borough of Ealing
Greenford is a town of about 38,000 people, 10 miles west of London. We cover every part of it, from UB6 and W7 out to Northolt, Southall.
What HMO works do we carry out in Greenford?
Conversions, refurbishments, kitchens and bathrooms, fire safety and council licence works across Greenford and UB6 and W7.
HMO conversions
- House to HMO conversion in Greenford
- Small HMO conversions (3–6 sharers) in Greenford
- Large HMO conversions (7+ sharers) in Greenford
- Commercial and above-shop to HMO in Greenford
HMO refurbishment
- Full HMO refurbishment in Greenford
- Void and between-tenancy refurbs in Greenford
- Bedroom upgrades and room refits in Greenford
- Student HMO refurbishment in Greenford
- Professional and co-living HMO refurbs in Greenford
Kitchens and bathrooms
- Ensuite installation in Greenford
- Communal kitchen refits in Greenford
- Shared bathroom and shower room refits in Greenford
Fire safety works
- HMO fire safety upgrades in Greenford
- Fire alarm and detection systems in Greenford
- Fire doors in Greenford
- Escape routes, emergency lighting and fire stopping in Greenford
Licence and compliance works
- Licence condition and schedule-of-works in Greenford
- Rewires and EICR remedials in Greenford
- Sound insulation in Greenford
- EPC and energy upgrades in Greenford
- Damp, mould and HHSRS repairs in Greenford
Extra rooms and layouts
- Loft conversions for extra rooms in Greenford
- Extensions for extra rooms in Greenford
- Layout changes and room reconfiguration in Greenford
HMO rules for Greenford
- Fire precautions follow a risk assessment; the LACORS guide is guidance, not law, but many councils base their standards on it.
- Electrical inspection at least every 5 years, with remedial work within 28 days.
- Licensed HMOs must meet national minimum bedroom sizes: 6.51 m² for one person aged 10 or over, 10.22 m² for two.
London Borough of Ealing: local HMO schemes
| Article 4 (HMO) | In force across the council area Immediate direction for Perivale from 30 Oct 2024 and non-immediate direction for the rest of the borough from 2025. |
|---|---|
| Additional licensing | In force across the council area Borough-wide additional licensing 1 Apr 2022-31 Mar 2027; renewal consulted 15 Jul-24 Sep 2026. |
| Selective licensing | In force in part of the council area Two designations covering most wards: 1 Apr 2022-31 Mar 2027 (e.g. Southall, East/North Acton) and 3 Jan 2023-2 Jan 2028 (e.g. Greenford, Northolt, Perivale, Ealing Common). |
Schemes change. Check the council’s current pages for the exact address in Greenford before you buy or start work. Source: London Borough of Ealing HMO licensing page, checked 2026-10-31.
Guide prices in Greenford
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £7,700 – £15,350 | house |
| Shared bathroom refit | £5,500 – £9,000 | £7,050 – £11,500 | bathroom |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £10,250 – £23,050 | kitchen |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £1,000 – £2,550 | house |
Nearby places we cover
Questions
Do you cover all of Greenford?
Yes. We work across Greenford and the UB6 and W7 postcode areas, plus the rest of Greater London. Nearby places we also cover include Northolt, Southall, Brent.
Which council covers HMOs in Greenford?
Greenford is covered by London Borough of Ealing. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
What HMO services do you offer in Greenford?
All of them: conversions, refurbishments, ensuites, kitchens and bathrooms, fire safety, licence works, electrics, sound and energy upgrades, lofts and extensions.