HMORefurbishment

England · East of England

Full HMO refurbishment across Essex

Stripping out and refurbishing a tired or failing shared house from top to bottom. Covering all of Essex, with a free site visit and fixed written quote.

Refurbished communal lounge and dining area in a shared house
In short: A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Across Essex, the work is planned around England’s HMO rules and the standards the local council publishes.
Nation
England
Pricing region
East of England
Postcode areas
CM, CO, SS, CB
Main towns
Southend-on-Sea, Basildon, Colchester, Chelmsford, Harlow

What does full HMO refurbishment in Essex involve?

  • Condition survey and schedule of works
  • Damp and mould repairs
  • Strip-out and making good
  • Heating and hot water upgrades
  • Fire doors, detection and escape route upgrades
  • New or refitted kitchens and bathrooms

Which rules apply in Essex?

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Councils assess hazards, including damp, mould and fire, under the HHSRS; revised regulations and guidance applied from 23 June 2026.

Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Essex?

Regional adjustment for East of England. Planning budgets: see our prices page.
ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£4,250 – £9,550letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£8,500 – £19,100kitchen
Shared bathroom refit£5,500 – £9,000£5,850 – £9,550bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£850 – £2,100house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,350 – £12,700house

Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.

Full HMO refurbishment by town in Essex

Questions about full HMO refurbishment in Essex

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Can you refurbish an HMO while tenants live there?

Sometimes, room by room, with the escape route kept clear and the fire alarm working at all times. For heavier work it is usually quicker and safer to do it with the house empty. We plan the phasing with you.

Do you carry out full HMO refurbishment across Essex?

Yes, across the whole of Essex, including Southend-on-Sea, Basildon, Colchester.

Who licenses HMOs in Essex?

HMOs in Essex are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.

Other HMO services in Essex

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote