A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Landlords in Harwich (CO12 and IP9) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.
- Area
- Essex, England
- Postcodes
- CO12 and IP9
- Location
- 47 miles south of Norwich
- Pricing region
- East of England
What does full HMO refurbishment in Harwich involve?
- Damp and mould repairs
- Strip-out and making good
- Fire doors, detection and escape route upgrades
- Heating and hot water upgrades
- Condition survey and schedule of works
Which rules apply in Harwich?
Here is what usually applies to a Harwich job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
- The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
How much does full HMO refurbishment cost in Harwich?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £4,250 – £9,550 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £8,500 – £19,100 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £5,850 – £9,550 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £850 – £2,100 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,350 – £12,700 | house |
These are typical ranges including VAT, adjusted for East of England, where costs run above the UK average. The fixed price for a house in Harwich follows a site visit.
How long does it take?
Typical time on site: 4–12 weeks. We agree the programme with you before starting and send photo updates as the work progresses.
When do Harwich landlords need it?
We usually get the call when:
- You have bought an existing HMO that needs work
- A council inspection or licence renewal has listed defects
Questions about full HMO refurbishment in Harwich
How much does a full HMO refurbishment cost?
It depends on size and condition. Our guide prices page shows typical UK ranges per room and per square metre, and we give a fixed written quote after a site visit.
Which postcodes in Harwich do you work in?
All of them, including CO12 and IP9, and the surrounding parts of Essex.
Does a shared house in Harwich need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much does full HMO refurbishment cost in Harwich?
Our guide ranges for East of England are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Full HMO refurbishment near Harwich
- Felixstowe · 3 mi
- Ipswich · 10 mi
- Clacton-on-Sea · 12 mi
- Colchester · 17 mi
- Stowmarket · 21 mi
- Sudbury · 24 mi
- All of Essex
Other HMO services in Harwich
- Void and between-tenancy refurbs in Harwich
- HMO fire safety upgrades in Harwich
- Rewires and EICR remedials in Harwich
- Communal kitchen refits in Harwich
- Shared bathroom and shower room refits in Harwich
- Damp, mould and HHSRS repairs in Harwich
- Ensuite installation in Harwich
- Large HMO conversions (7+ sharers) in Harwich
