HMORefurbishment

Hampshire, England

Full HMO refurbishment in Eastleigh

Planning full HMO refurbishment in Eastleigh? We survey, price and build HMO works across Eastleigh (SO50) and the rest of Hampshire.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Eastleigh is 5 miles north-east of Southampton. We price full HMO refurbishment there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Hampshire, England
Postcodes
SO50
Location
5 miles north-east of Southampton
Pricing region
South East

What does full HMO refurbishment in Eastleigh involve?

  • Rewire or electrical upgrades
  • Strip-out and making good
  • Condition survey and schedule of works
  • Decoration, flooring and furniture-ready rooms
  • Fire doors, detection and escape route upgrades

Which rules apply in Eastleigh?

Here is what usually applies to a Eastleigh job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.

How much does full HMO refurbishment cost in Eastleigh?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£4,500 – £10,100letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£8,950 – £20,150kitchen
Shared bathroom refit£5,500 – £9,000£6,150 – £10,100bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,700 – £13,450house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Eastleigh can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 4–12 weeks on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Eastleigh landlords need it?

We usually get the call when:

  • You have bought an existing HMO that needs work
  • A house that has been let hard for years

Questions about full HMO refurbishment in Eastleigh

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Which postcodes in Eastleigh do you work in?

All of them, including SO50, and the surrounding parts of Hampshire.

Where do I check the HMO rules for an address in Eastleigh?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Eastleigh?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Eastleigh

Other HMO services in Eastleigh

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote