- Nation
- England
- Pricing region
- West Midlands
- Postcode areas
- CV, B, OX, GL
- Main towns
- Nuneaton, Rugby, Royal Leamington Spa, Warwick, Bedworth
What does full HMO refurbishment in Warwickshire involve?
- New or refitted kitchens and bathrooms
- Decoration, flooring and furniture-ready rooms
- Condition survey and schedule of works
- Damp and mould repairs
- Rewire or electrical upgrades
- Strip-out and making good
Which rules apply in Warwickshire?
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
- Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.
Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much does full HMO refurbishment cost in Warwickshire?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £4,000 – £9,000 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £8,000 – £18,000 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £5,500 – £9,000 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £800 – £2,000 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,000 – £12,000 | house |
Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.
Full HMO refurbishment by town in Warwickshire
Questions about full HMO refurbishment in Warwickshire
Will you deal with the council’s list of works?
Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.
Can you refurbish an HMO while tenants live there?
Sometimes, room by room, with the escape route kept clear and the fire alarm working at all times. For heavier work it is usually quicker and safer to do it with the house empty. We plan the phasing with you.
Do you carry out full HMO refurbishment across Warwickshire?
Yes, across the whole of Warwickshire, including Nuneaton, Rugby, Royal Leamington Spa.
Who licenses HMOs in Warwickshire?
HMOs in Warwickshire are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.
Other HMO services in Warwickshire
- Void and between-tenancy refurbs in Warwickshire
- HMO fire safety upgrades in Warwickshire
- Rewires and EICR remedials in Warwickshire
- Communal kitchen refits in Warwickshire
- Shared bathroom and shower room refits in Warwickshire
- Damp, mould and HHSRS repairs in Warwickshire
- Small HMO conversions (3–6 sharers) in Warwickshire
- Ensuite installation in Warwickshire
