Rewires and EICR remedials in Holloway

We carry out rewires and EICR remedials in Holloway, 3 miles north of London, working to the HMO rules that apply in England and to the council’s written HMO standards.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Holloway (N7) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Greater London, England
Postcodes
N7
Location
3 miles north of London
Pricing region
London

What do rewires and EICR remedials in Holloway involve?

  • Electrical installation certificates
  • Mains-powered alarm circuits
  • Emergency lighting circuits
  • Consumer unit replacement
  • Full or partial rewires

Which rules apply in Holloway?

Rewires and EICR remedials in Holloway must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Holloway?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£190 – £510inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£900 – £1,800house
Full rewire, 4–5 bedroom house£6,000 – £12,000£7,700 – £15,350house

Prices in Holloway are shown with our regional adjustment for London (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Holloway landlords need it?

We usually get the call when:

  • Old wiring or an old fuse board
  • An EICR with C1, C2 or FI items

Questions about rewires and EICR remedials in Holloway

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

How far do you travel from Holloway?

We cover the whole of Greater London and work UK-wide. For Holloway the nearest towns on our list are Highbury (1 miles), Archway (1 miles), Camden Town (1 miles).

Where do I check the HMO rules for an address in Holloway?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do rewires and EICR remedials cost in Holloway?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Holloway

Other HMO services in Holloway

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote