HMORefurbishment

Greater London, England

EPC and energy upgrades in Richmond

Planning EPC and energy upgrades in Richmond? We survey, price and build HMO works across Richmond (TW9 and TW10) and the rest of Greater London.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. Landlords in Richmond (TW9 and TW10) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Greater London, England
Postcodes
TW9 and TW10
Location
8 miles south-west of London
Pricing region
London

What do EPC and energy upgrades in Richmond involve?

  • Review of the EPC recommendations
  • Double or secondary glazing
  • Internal or external wall insulation
  • Loft and roof insulation
  • LED lighting

Which rules apply in Richmond?

EPC and energy upgrades in Richmond must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Rented homes must currently meet at least EPC E, with a £3,500 spending cap. The government plans EPC C by October 2030, subject to legislation.
  • Councils assess hazards, including damp, mould and fire, under the HHSRS; revised regulations and guidance applied from 23 June 2026.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

How much do EPC and energy upgrades cost in Richmond?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£830 – £1,600house
Internal wall insulation£60 – £100£80 – £130m² of wall

Prices in Richmond are shown with our regional adjustment for London (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Allow 2–15 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Richmond landlords need it?

We usually get the call when:

  • An EPC below the required minimum
  • High bills in an all-inclusive rent

Questions about EPC and energy upgrades in Richmond

Will insulation cause condensation?

Not if it is designed with ventilation and vapour control. We always pair insulation with suitable ventilation.

Do you cover all of Richmond?

Yes. We work across Richmond and the TW9 and TW10 postcode areas, plus the rest of Greater London. Nearby places we also cover include Isleworth, Hounslow, Barnes.

Where do I check the HMO rules for an address in Richmond?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do EPC and energy upgrades cost in Richmond?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Richmond

Other HMO services in Richmond

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote