A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Landlords in Wood Green (N22) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.
- Area
- Greater London, England
- Postcodes
- N22
- Location
- 6 miles north of London
- Council
- London Borough of Haringey
- Pricing region
- London
What does full HMO refurbishment in Wood Green involve?
- Decoration, flooring and furniture-ready rooms
- Damp and mould repairs
- Rewire or electrical upgrades
- Condition survey and schedule of works
- Fire doors, detection and escape route upgrades
Which rules apply in Wood Green?
The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Wood Green before we price.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
London Borough of Haringey: local HMO schemes
| Article 4 (HMO) | In force in part of the council area Article 4 Direction (C3 to C4) in force since 2013 for the area set out on the council's map. |
|---|---|
| Additional licensing | In force across the council area Borough-wide additional licensing (all 21 wards) 17 Jun 2024-16 Jun 2029, approved 12 Mar 2024. |
| Selective licensing | In force in part of the council area Selective licensing in 14 eastern wards (incl. Tottenham, Northumberland Park, Seven Sisters, Noel Park) 17 Nov 2022-16 Nov 2027. |
Schemes change. Check the council’s current pages for the exact address in Wood Green before you buy or start work. Source: London Borough of Haringey HMO licensing page, checked 2026-10-31.
How much does full HMO refurbishment cost in Wood Green?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £5,100 – £11,500 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £10,250 – £23,050 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £7,050 – £11,500 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £1,000 – £2,550 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £7,700 – £15,350 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Wood Green can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Allow 4–12 weeks on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.
When do Wood Green landlords need it?
Landlords in Wood Green most often ask us for this when:
- A council inspection or licence renewal has listed defects
- You have bought an existing HMO that needs work
Questions about full HMO refurbishment in Wood Green
How much does a full HMO refurbishment cost?
It depends on size and condition. Our guide prices page shows typical UK ranges per room and per square metre, and we give a fixed written quote after a site visit.
Which postcodes in Wood Green do you work in?
All of them, including N22, and the surrounding parts of Greater London.
Which council covers HMOs in Wood Green?
Wood Green is covered by London Borough of Haringey. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much does full HMO refurbishment cost in Wood Green?
Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Full HMO refurbishment near Wood Green
- Muswell Hill · 1 mi
- Tottenham · 2 mi
- Archway · 2 mi
- Stamford Hill · 3 mi
- Edmonton · 3 mi
- Holloway · 3 mi
- All of Greater London
Other HMO services in Wood Green
- Void and between-tenancy refurbs in Wood Green
- HMO fire safety upgrades in Wood Green
- Rewires and EICR remedials in Wood Green
- Communal kitchen refits in Wood Green
- Shared bathroom and shower room refits in Wood Green
- Damp, mould and HHSRS repairs in Wood Green
- Ensuite installation in Wood Green
- Escape routes, emergency lighting and fire stopping in Wood Green
